Monbulk community’s growing need for enhanced sport and public facilities, culminated in the development of this major Sports Pavilion.
Drawing heavily on Rodine’s ‘live’ build expertise, Rodine successfully ensured uninterrupted screenings at the Classic Cinema complex.
Despite the lockdown and site challenges, Rodine were able to complete all the works within the expected time frame set by the Yarra Ranges Council.
This project included the removal and replacement of eight existing travelators in the busy Vicinity Centres at Bayside.
Rodine seamlessly worked through the complicated layout of the reticulated beer and post-mix systems which ran over a great distance.
Throughout the heavy demolition and refurbishment, the challenge offered to Rodine was to maintain accessibility and amenities for all tenants in this A-grade office building.
Rodine sourced and installed recycled timber wall paneling to meet the client’s specifications and within the project’s tight six-week timeline.
Rodine's innovative solution for moving the barrel vaults into place was to use a heavy-lift helicopter.
Rodine oversaw this renovation of a historic building into Melbourne’s premier craft beer hall.
Minimising impact to tenants' trade provided a narrow window for what was in effect heavy demolition and structural rebuilding.
Returning to a Haileybury campus for the fifth consecutive year, Rodine was required to demolish and rebuild the Science building.
Rodine was engaged to build a new feature glass lift shaft at Bayside Shopping Centre.
This phase of Southland's refurbishment required replacing lighting, flooring and installation of new seating and other visitor amenities.
With a reputation for top-end design, the client had very high expectations for the quality of workmanship to be delivered by Rodine Australia.
The lack of Australian experience with these new travelators, presented no difficulty to our innovative Rodine team.
Engaged in the aftermath of the fire to secure the site and make the remaining structures safe, Rodine successfully tendered for reconstruction.
This project involved the construction of a new venue for Zara's third Melbourne store.